A tunnel will be built under the city as part of the CPK. Tender announced

The tunnel will be a key element of the so-called Y, the planned high-speed railway route between Warsaw, CPK, Lodz, Wrocław and Poznań. “This is a very important investment that will impact the operation of Polish railways, as well as being an important step in the implementation of the 100-minute Poland project,” Infrastructure Minister Dariusz Klimczak said in the statement.

The tunnel will be excavated with a TBM mechanical shield with a diameter of about 14 meters. It will be about 4.6 km long. There will be two tracks inside, allowing trains to run in both directions.”This will be the longest and largest underground railway crossing built using this method in Poland so far.“- said Philip Cherniki, head of the Kurdistan Communist Party.

Leave a Reply

Your email address will not be published. Required fields are marked *

You May Also Like

Brown and Winnickie catch eagle popularity

“If Winnicki wants to save on brewing, then let him start a…

The Moscow Stock Exchange will start operating again

The last time the session was held on the Moscow Stock Exchange…

He has the longest legs in the world. See how you look compared to other women

Have you ever wondered what the longest legs in the world look…

Getin Bank – What will happen to loans in francs?

Maricus Pictures / / stock struggle At the end of the first…